Weatherford Artificial Lift Systems

New Build
Tenant Finish
,
Office
Industrial

After the original general contractor filed for bankruptcy, Alcorn stepped in to deliver a successful outcome. This situation required us to work very closely with Weatherford to assess and document the existing conditions before construction started. Relationships with the existing subcontractors were maintained, where possible, to limit costs and liability for Weatherford, and to be fair to the subs left exposed by the bankruptcy.

I-25 Business Park 4080 Camelot Cir. Longmont, CO 80504
Size:
Client:
Weatherford
Architect:
ArchIteriors
Construction Manager:
Developer:
Broker:
Building Owner:

Similar PROJECTS

View All
Fiesta Tech Center
Gilbert
Industrial
Fiesta Tech Center
Under Construction
Palm Gateway Logistics Center Spec Office and Warehouse Finish
Mesa
Industrial
Office
Palm Gateway Logistics Center Spec Office and Warehouse Finish
Under Construction
Event Rents TI
Phoenix
Industrial
Office
Event Rents TI
Under Construction
FlexHQ
Denver
Industrial
Office
FlexHQ
Under Construction